Modularni metalni plafon paneli

Višepanelni metalni plafon

Modularni metalni plafon koji kombinuje panele različitih veličina, boja i tekstura u jedan dizajn — pretvarajući plafon u dizajnersko platno.

Material DX51D+Z galvanized steel or AA3005 aluminum
Module Sizes 300×300 – 600×1200 mm mixed; custom CNC shapes
Panel Thickness 0.5–0.8 mm steel; 0.6–1.0 mm aluminum
Surface Finish Zone-based matte / satin / gloss RAL, wood-look, anodized
Kratak odgovor

The multi-panel metal ceiling is a modular suspended system combining panels of 300×300 to 600×1200 mm in different sizes, colors and textures within one design. It offers CNC custom shapes, zone-based NRC 0.60–0.85 acoustics and A2-s1,d0 fire class; production typically takes 2–4 weeks.

The multi-panel metal ceiling system is a modular suspended ceiling solution that combines panels of different sizes, colors and textures within a single design. Square and rectangular modules from 300×300 mm up to 600×1200 mm are combined on one plane or across level changes, turning the ceiling into a design canvas that carries the brand identity of the space.

Panels are produced from DX51D+Z galvanized steel (EN 10346) or AA3005 aluminum in 0.5–1.0 mm gauges. Every zone can differ: matte and gloss finishes can sit side by side, and brand-color RAL shades, wood-look and anodized surfaces can share the same layout. Zone-based micro-perforation (12/25 mm pattern) with acoustic fleece achieves NRC 0.60–0.85 absorption in the perforated areas.

Installation uses a clip-in and hook-on hybrid on concealed carriers; each zone can be removed and refitted independently, keeping services accessible. All components reach fire class A2-s1,d0 under EN 13501-1; the system complies with EN 13964 and is installed on ASTM C635 compliant carriers.

Lighting, HVAC and sprinkler outlets are positioned according to the zone plan and can be concealed within the different modules. CNC-cut custom shapes — logos, lettering and geometric patterns — can be applied as a brand signature on the ceiling; level changes and downstand boxes are solved with the same system.

Boutique and open-plan offices, hotel interiors, concept stores, showrooms, corporate entrance halls and educational or cultural venues are typical applications. A project-specific layout drawing is provided; production is typically completed within 2–4 weeks.

Material DX51D+Z galvanized steel or AA3005 aluminum
Module Sizes 300×300 – 600×1200 mm mixed; custom CNC shapes
Panel Thickness 0.5–0.8 mm steel; 0.6–1.0 mm aluminum
Surface Finish Zone-based matte / satin / gloss RAL, wood-look, anodized
Perforation Zone-based 12/25 mm pattern + acoustic fleece
Acoustic Performance NRC 0.60–0.85 (perforated zones)
Fire Classification EN 13501-1: A2-s1,d0
Weight 2.8–4.8 kg/m²
  • Boutique and open-plan offices
  • Hotel interiors and lobbies
  • Concept stores and showrooms
  • Corporate entrance halls
  • Educational and cultural venues
  • Restaurant and café concepts
  • Square and rectangular modules of mixed sizes on one plane
  • Zone-based color, texture and gloss combinations
  • CNC-cut custom shapes: logos, lettering and geometric patterns
  • NRC 0.60–0.85 absorption in perforated zones
  • Hybrid clip-in / hook-on mounting with per-zone demounting
  • Level changes and downstand boxes in the same system
  • Brand-color RAL, wood-look and anodized options
  • EN 13501-1 A2-s1,d0 fire class and EN 13964 compliance

Sertifikati

  • EN 13964
  • EN 13501-1: A2-s1,d0
  • ISO 9001 quality management
  • CE (EU Construction Products Regulation)

Montaža i primena

  1. 1 The layout pattern and module plan are approved; the zone map is handed to the installation team.
  2. 2 Hanger wires and the concealed carrier grid (ASTM C635) are set and levelled.
  3. 3 Clip-in and hook-on panels are clipped onto the grid according to the zone plan.
  4. 4 CNC-shaped panels and brand graphics are fitted in place.
  5. 5 Level changes, downstand boxes and perimeter trims are closed.
  6. 6 Acoustic fleece is placed in perforated zones; final alignment and inspection are completed.